必典考网

专业英语题库2022模拟考试系统106

来源: 必典考网    发布:2022-04-17     [手机版]    
  • 下载次数:
  • 支持语言:
  • 149次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布专业英语题库2022模拟考试系统106,更多专业英语题库的模拟考试请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

A. Planning
B. Executing
C. Monitoring and Controlling
D. Closing


2. [单选题]PDM includes four types of dependencies or precedence relationships:().The completion ofthe successor activity depends upon the initiation of the predecessor activity.

A. Finish-to-Start
B. Finish-to-Finish
C. Start-to-Start
D. Start-to-Finish


3. [单选题]()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period.

A. Plannedvalue
B. Earned value
C. Actualcost
D. Costvariance


4. [单选题]The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()

A. executedin
B. inspectedin
C. check-in
D. look-in


5. [单选题]()involves using mathematical techniques to forecast future outcomes based onhistorical results.

A. Trendanalysis
B. Qualityaudit
C. Defect repair review
D. Flowcharting


6. [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.

A. proceedings
B. controls
C. forecastings
D. Prelibations


7. [单选题]Estimating activity durations uses information on activity scope of(),required resource types, estimated resource quantities, and resource calendars.

A. milestone
B. baseline
C. quality
D. work


8. [单选题]Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to()progress.

A. analyze
B. track
C. level
D. extend


9. [单选题]()is a property of object-oriented software by which an abstract operation may be performed in different ways in different classes.

A. Method
B. Polymorphism
C. Inheritance
D. Encapsulation


10. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.

A. A


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/wk80j0.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号