1. [单选题]() is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype
A. milestone
B. deliverable
C. etc
D. BAC
2. [单选题]() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
A. projectacceptance
B. scopeverification
C. scopedefinition
D. WBS Creation
3. [单选题]() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
A. Process
B. Milestone
C. Work
D. Deliverables
4. [单选题]The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
A. executedin
B. inspectedin
C. check-in
D. look-in
5. [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
A. proceedings
B. controls
C. forecastings
D. Prelibations
6. [单选题]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.
A. PERT
B. Resourceleveling
C. Schedulecompression
D. Critical chain method
7. [单选题]Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()
A. independentresource
B. individualworkload
C. workmilestone
D. workpackage
8. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.
A. C
9. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A. C