  • [单选题]() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.

  • A. controls
    B. baselines
    C. projectstakeholders
    D. projectmanagers

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
  • A. Process
    B. Milestone
    C. Work
    D. Deliverables

  • [单选题]The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
  • A. agreed-to
    B. agree-to
    C. agree-to-do
    D. agree-with

  • [单选题]You are working on the cost budget for one project. Which of the following is true()
  • A. This process assigns cost estimates to project activities including risks and contingency plans.
    B. The cost baseline will be used to measure variances and future project performance.
    C. This process assigns cost estimates for expected future period operating costs.
    D. The cost baseline is the expected cost for the project.

  • [单选题]A ()is a collection of projects and other work that are grouped together to facilitate effective management ofthat work to meet strategic business objectives.
  • A. program
    B. portfolio
    C. projectoflargesize
    D. PMO

  • [单选题]An example of scope verification is ().
  • A. review the performance ofan installed software module
    B. managing changes to the project schedule
    C. decomposing the WBS to a work package level
    D. performing a benefit/cost analysis to determine if we should proceed with the project

  • [单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.
  • A. D

  • [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.
  • A. A

  • [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
  • A. A

  • [单选题]Fair and(1) competition in government procurement around the world is good business and good public policy. Competitive pricing, product(2)and performanceimprovements result from competitive practices and help ensure that government authoritiesget the best (3)for the public they serve.
  • A. C