正确答案: A

review the performance ofan installed software module

题目:An example of scope verification is ().

查看原题 查看所有试题

学习资料的答案和解析:

  • [单选题]Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
  • product

  • 解析:该题的关键词为"Project Quality Management、product quality measures and techniques"。题干包含三个单独的语句,但其逻辑关联紧密,可注意到后两句是对前一句的补充说明,其语句结构分别为"Project Quality Management(主语)must address(谓语)","Project Quality Management(主语)applies(谓语)to all projects","product quality measures and techniques(主语) are specific(谓语)to the particulartype of product produced by the project",首句说明项目质量管理必须关注项目的管理以及项目什么的管理,后两句则说明项目生成的特定产品的度量与技术因产品的不同而有差异。根据语句的逻辑关系,应该选择选项C。

  • [单选题]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.
  • Critical chain method


  • [单选题]The (1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (2).
  • 解析:(1)题的关键词为"work flow management system",其语句结构为"The()(主语)1S(谓语)agener aldescription(表语)",含义为"什么是通用的描述",结合选项应该选择选项B。(2)题的关键词为"work flow enactment service",其语句结构为"The work flow enactment service(主语)is(谓语)the hear to fa work flow system(表语)whichconsistsofseveral()(定语从句)",含义为"工作流定制服务是工作流系统的核心,它由几个什么组成",结合选项应该选择选项A。(1)题和(2)题考查了工作流相关的基本概念,如果了解工作流相关知识则不难做出选择。对于只有硬件背景的考生,(1)题相对容易,(2)题则只能碰运气了。

  • 推荐下载科目: 软件构件技术和软件体系结构题库 项目采购管理题库 外包管理题库 需求管理题库 战略管理概述题库 业务流程管理和重组题库 组织级项目管理与大型项目管理题库 知识管理题库 软件工程知识题库 高级网络规划设计师题库