正确答案: C
Avoid
题目:The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.
解析:该题的关键词为"negative risks、response strategies",其语句结构为"When dealing with negative risks(状语从句),there are(谓语)three main response strategies()Transfer,Mitigate(主语)",含义为"当应对负面风险时,有三种应对方法,分别是什么、转移和减弱。",根据负面风险的应对方法,可知是规避,应该选择Avoid。
查看原题 查看所有试题
学习资料的答案和解析:
[单选题]The()describes, in detail, the project's deliverables and the work required to create those deliverables.
[单选题]Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
product
解析:该题的关键词为"Project Quality Management、product quality measures and techniques"。题干包含三个单独的语句,但其逻辑关联紧密,可注意到后两句是对前一句的补充说明,其语句结构分别为"Project Quality Management(主语)must address(谓语)","Project Quality Management(主语)applies(谓语)to all projects","product quality measures and techniques(主语) are specific(谓语)to the particulartype of product produced by the project",首句说明项目质量管理必须关注项目的管理以及项目什么的管理,后两句则说明项目生成的特定产品的度量与技术因产品的不同而有差异。根据语句的逻辑关系,应该选择选项C。
[单选题]An example of scope verification is ().
review the performance ofan installed software module
[单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.