【导读】
必典考网发布2022高级信息系统项目管理师题库专业英语题库试题专家解析(04.08),更多专业英语题库的答案解析请访问必典考网高级信息系统项目管理师题库频道。
1. [单选题]Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
A. qualityplanning
B. qualityassurance
C. qualityperformance
D. quality control
2. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.
A. A