【名词&注释】
多态性(polymorphism)、准确性(accuracy)、完整性(integrity)、管理知识、什么的
[单选题]() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
A. projectacceptance
B. scopeverification
C. scopedefinition
D. WBS Creation
查看答案&解析
查看所有试题
学习资料:
[单选题]() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
A. Process
B. Milestone
C. Work
D. Deliverables
[单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables
[单选题]()is a property of object-oriented software by which an abstract operation may be performed in different ways in different classes.
A. Method
B. Polymorphism
C. Inheritance
D. Encapsulation
[单选题]An example of scope verification is ().
A. review the performance ofan installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project
本文链接:https://www.51bdks.net/show/d6yvx.html