必典考网

2022高级信息系统项目管理师题库专业英语题库模拟练习题107

来源: 必典考网    发布:2022-04-18     [手机版]    
  • 下载次数:
  • 支持语言:
  • 907次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布2022高级信息系统项目管理师题库专业英语题库模拟练习题107,更多专业英语题库的模拟考试请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]The()defines the phases that connect the beginning of a project to its end.

A. schedule
B. project life cycle
C. temporary
D. milestone


2. [单选题]()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period.

A. Plannedvalue
B. Earned value
C. Actualcost
D. Costvariance


3. [单选题]The()process analyzes the effect of risk events and assigns a numerical rating to those risks.

A. Riskldentification
B. Quantitative RiskAnalysis
C. Qualitative RiskAnalysis
D. Risk Monitoring and Control


4. [单选题]Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.

A. Project
B. project management team
C. performingorganization
D. customer


5. [单选题]Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

A. qualityplanning
B. qualityassurance
C. qualityperformance
D. quality control


6. [单选题]A ()is a collection of projects and other work that are grouped together to facilitate effective management ofthat work to meet strategic business objectives.

A. program
B. portfolio
C. projectoflargesize
D. PMO


7. [单选题]The TCP protocolis a ()layer protocol.

A. physical
B. network
C. transport
D. application


8. [单选题]An example of scope verification is ().

A. review the performance ofan installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project


9. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.

A. A


10. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. C


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/49ye79.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号